Project title
Fallujah south water elevated tank renovation
Beneficiary side
Fallujah rehabilitation committee
Contract no.
W917BG-05-C-0036
Location
South of Fallujah in nezal district
Contract amount
69,000$
Contract period
3/2/2005-3/4/2005
Description
when the project was awarded the elevated tank was damaged by bolts so the construction committee of Fallujah decided to fix all the halls in the body of the tank and finishing them properly with good quality painting and we put tow engineers to look after this project because it is very important for Fallujah city , there was tow committees inspect our project one from the USACE and the other from Iraqi government , when the work was completed we test the elevated tank to see if it is workable or not and the result was very positive so we deliver the tank to the Iraqi government and the water arrived to each single house in that area, the work was include fixing the halls and cracks ,painting and testing
اسم المشروع
مشروع ترميم خزان الماء الصافي لمنطقة حي النزال
الجهه المستفيده
لجنه اعمار الفلوجه
رقم المشروع
W917BG-05-C-0036
موقع المشروع
الانبار / الفلوجة / حي النزال
مبلغ العقد
69,000 $
مده المشروع
3/2/2005-3/4/2005
التفاصيل
عندما تم احالة هذا المشروع لشركتنا كان خزان الماء الصافي بحالة سيئة بسبب تعرضة لاضرار كبيرة نتيجة الاطلاقات النارية والشظايا اثناء معارك الفلوجة لذا قمنا باعمال الصيانة لهذا الخزان شاملا العمل اعمال سد الثقوب الناتجة عن الاطلاقات النارية بواسطة عملية اللحيم على ان يكوزن الانهاء مطابق للمواصفات الفنية وبدقة متناهية لما له من اهمية من تزويد الماء الصافي الصالح للشرب للمواطنين مع الصبغ الدهني العالي الجوده والخاص لمياه الشرب ، كان هناك لجان تفتيشية تتابع العمل عن كثب لضمان سير العمل بشكل هندسي وصحيح وعند الانتهاء من ترميم وصيانة الخزان تم اجراء الفحص على الخزان المذكور وكانت النتيجة مطابقة للمواصفات وجيده جدا وعند الانتهاء من الفحص تم تسليم الخزان الى الجهات ذات العلاقة في مدينة الفلوجة حيث بصيانة هذا الخزان تم ايصال الماء الصافي للمواطني