Project title : AL-Zuhur bridge
Beneficiary side : Baghdad municipality
Contract no. 30/2008
Location : Baghdad almansoor
Contract amount : 13,825,660,000 I.D
Contract period : 365 working days
the bridge is about 480 m.l containing two types of piles ( 0.8,1.2)m in diameter
Description
there are 14 piers and 13 spans ( 12 spans 20.1 m.l and the other 1 span 40 m.l ) there are 3 steel girder spans in this bridge and we used ST-52 steel as specified in specifications the pile cap dimensions 17.35*6.4*1.65 m columns 1 m in diameter , the work include construct bore piles 1 m in dia. , pile cap , columns , prestress girders , cross head , slabs , walk away , middle separator and pavement as well as renovation of surrounding roads . The work completed according to specifications
مشروع انشاء مجسر تقاطع الزهور في المنصور
محافظه بغداد
٣٠/٢٠٠٨ ط د
بغداد / المنصور
13,825,660,000 I.D
٣٦٥ يوم
الجسر حوالي 480 م.ط تحتوي على نوعين من الركائز قطر(0.8،1.2) متر وهناك 14 بير و 13 فضاء (12 فضاء بطول 20،1 والآخر بطول40
ST-52ثلاثة فضائات تتكون من ستيل كيردر
الأعمدة قطر1 متر أبعاد قبعه الركائز 17.35 * 6.4 * 1.65 م
ويشمل العمل الحفر وصب الركائز ، قبعه الركائز ، الاعمده ، الرافد الكونكريتيه والحديديه ، قبعه الاعمده ، السقوف ، المماشي ، الجزره الوسطيه والتبليط
العمل انجز حسب المواصفات الفنيه وتوجيهات المهندس المشرف