Project title
AL-Rehyad school renovation
Beneficiary side
Fallujah rehabilitation committee
Contract no.
4-05-03-1020
Location
Iraq-Anbar-Fallujah-Saqlawya
Contract amount
36,547 $
Contract period
10/6/2004-10/8/2004
AL-Rehyad school in AL-Saqlawya area served about 500 students from boys and girls but there was no facilities in this school to serve the students. when the contract was awarded we tried hard to renovate this school to make it workable for the students so we done every thing such us( plastering , painting inside and out side , casting the out side yards and walkways , fixing the floors for classes , electricity , new furniture for teachers , doors , windows, roofing , out side green area , etc... ) we tried to make the work quality on top because it is far a way from cities and it was a warded before but the contractor( the last contractor )says that no body will inspect his work and it is a very black point in the profile of any contractor thinking like that . when the school was completed we deliver it and it was more than workable and we think this is important more than money
اسم المشروع
مشروع اعادة ترميم مدرسة الرياض الابتدائية
الجهه المستفيده
لجنه اعمار الفلوجه
رقم المشروع
4-05-03-1020
موقع المشروع
الانبار / الفلوجة / الصقلاوية
مبلغ العقد
36,547 $
مده المشروع
10/6/2004-10/8/2004
التفاصيل
مدرسة الرياض الابتدائية في الصقلاوية تخدم خمسمائة طالب تقريبا من كلا الجنسين ، كانت هذه المدرسة اسوء حالاتها وذلك بسبب تردي الخدمات في تلك المنطقة وعندما تم احالة هذا المشروع لشركتنا قمنا بترميم هذه المدرسة بجميع فقراتها ( اعمال البياض ، الصبغ الداخلي والخارجي ، صب الساحات الخارجية والمماشي ، تطبيق الكاشي الموزاييك للصفوف ، اعمال الكهرباء ، تجهيز اثاث جديد للمدرسين ، تجهيز ونصب ابواب جديده ، تجهيز ونصب شبابيك جديده ، اعمال التسطيح ، اعمال الساحات الخضراء الخارجية ، الخ ) وقمنا بانهاء العمل حسب المواصفات الفنية وبجوده عالية وضمن المدة المقررة للمشروع .