Project title
AL-DALA BRIDGE PROJECT IN SALAH AL-DIN PROVINCE
Beneficiary side
ministry of municipality – directorate of Tikrit
Contract
31 / 2013
Location
salah al-din province – Tikrit – al-dala intersection
Contract amount
Contract period
21,970,136,000 ID
27 months
Description
The project consist of two bridges (A) and (B) intersecting with each different two levels with a maximum height of the bridge (A) 17 meters and a maximum height of the bridge (B) 10 meters at their intersection point and the length of bridge (A) with approaches 1000 meters and a width of 11 meters It consists of 15 span (Box girder) length of 36 meters for each span total length of bridge (B) with approaches 875 meters width 8 meters and consists of 9 span (Box girder) length of 36 meters for each span with the development of the surrounding area of infrastructure (sewage rainwater, storm water, pure water network, power grid, lighting, optical network and voice communications) and pavements and roads as well as the establishment of an alternative ways
اسم المشروع
مشروع انشاء مجسر الدلة في محافظة صلاح الدين
الجهه المستفيده
وزارة البلديات والاشغال العامة – مديرية بلدية تكريت
رقم المشروع
٣١ لسنة ٢٠١٣
موقع المشروع
صلاح الدين / تكريت
مبلغ العقد
21,970,136,000 ID
مده المشروع
٢٧ شهر اي ما يعادل 810 يوم
التفاصيل
يتكون المشروع من مجسرين متقاطعين مع بعضهما بمستويين مختلفين حيث يبلغ اقصى ارتفاع للمجسرات١٧ متر و ١٠ متر في نقطه تقاطعهما ويبلغ طول المجسر ١مع مقترباته ١٠٠٠ متر وبعرض ١١ متر ويتكون من ١٥ فضاء بطول ٣٦ متر للفضاء الواحد كما ويبلغ طول المجسر ٢مع مقترباته ٨٧٥ متر بعرض ٨ متر ويتكون من ٩ فضاءات بطول ٣٦ متر للفضاء الواحد مع تطوير المنطقه المحيطه بالمجسرين من بنى تحتيه ( مجاري ، مياه امطار ، مياه ثقيله ، شبكه الماء الصافي ، شبكه الكهرباء والاناره ، شبكه الاتصالات الضوئيه والصوتيه ) والارصفه والطرق وكذلك انشاء طريق بديله متكامله لتلافي الزخم الحاصل في منطقه انشاء المشروع