SEWAGE PROJECT AREA B

Project title

Area B

Contract Number

W91GY1-06-R-0017

Location

Falljah \ Al-Nazal quarter

Contract amount (USD)

$ 4,200,000

Contract duration

1/11/2006 -1/7/2007

When was it completed

within time

Describe the project

The purpose of this project is to make a full workable sewage system for Al-Nazal quarter , the work include excavation with different depths , compaction , filling with sub-base layer with compaction , installing pipes ( 100 , 200 , 250 , 315 , 400 , 500 mm), fill with sub-base second layer with compaction and the last stage is to refill with the excavated materials and paving ,the work include constructing different types of manholes nearly each 50 M.L, the total length of the project about 29000 M.L with service connections to the houses to serve about 29000 house, there is different committees inspecting our work and now we reached about 60 % from the project with high quality work.

أسم المشروع

تنفيذ شبكة الصرف الصحي لمنطقة حي النزال في الفلوجة

رقم المقاولة

W91GY1-06-R-0017

الموقع

الانبار / الفلوجة

مبلغ المقاولة

$ 4,200,000

مدة المشروع

ضمن المدة المحددة

تاريخ إنهاء المشروع

1/11/2006 -1/7/2007

التفاصيل

الغرض من هذا المشروع هو انشاء شبكة الصرف الصحي في منطقة حي النزال حيث ان هذه المنطقة تعاني من تردي الخدمات والعمل يتضمن الحفر باعماق مختلفة والحدل الجيد تحت الانبوب ثم الدفن بطبقة من الحصى الخابط بسمك 20 سم وحدلها بشكل جيد ومن ثم مد الانابيب باقطار مختلفة ( 100 ، 200 ، 250 ، 315 ، 400 ، 500 ملم ) ، ودفن طبقة الحصى الخابط فوق الانبوب بسمك 20 سم مع الحدل اليدوي الجيد واعادة الاملاء بنفس التربة المحفورة مع الحدل الجيد وعند الوصول الى اخر طبقة يتم اعادة اكساء الشارع بالتبليط او الكونكريت وحسب ما كان موجودا قبل الحفر ، ويتضمن العمل ايضا انشاء مانهولات مختلفة الابعاد كل 50 متر طول تقريبا ، يوجد عدة لجان لمتابعة العمل المنفذ لضمان النوعية الجيده والمواصفات الهندسية المطلوبة .